We supply equipment for the tunnel kiln
mini tunnel kiln for bricks turnkey factory the most profitable production for small businesses
The length of a mini tunnel kiln for brick firing 90-100M
Inside Width Mini 2.5m Brick Tunnel Kiln
Productivity 50000-70000pcs per day
Total Amount 3600000USD Includes
1) Feeder
2) Roller crusher
3) Double roll mixer SJ2500 × 312
4) Two-stage vacuum extruder JKR50 / 50 / 3.0
5) Machine for cutting workpieces
6) Separating and transporting raw mechanism
7) Belt conveyor
8) Belt conveyor
9) Cabinet control
Equipment for the furnace:
1) Trolleys 50pcs
2) Ferry for transportation
3) Hydraulic pusher
4) Traction device at the outlet of the furnace
5) Traction device for trolley
6) Smoke exhaust fan Y4-73. No.12C
7) Fan Y4-73. No.12C
9) Cooling fan T35-NO.9
10) fan T35-NO.9
11) Cabinet control
12) All refractory materials for the furnace (80, 000 pieces of standard refractory brick at the buyer's expense)
13) Rails and accessories
we offer you equipment and technology for the construction or modernization of brick factories with a capacity of 5 - 120 million, conditional brick per year, including the study of raw materials, delivery, installation supervision and commissioning of turnkey equipment with warranty tests.
Brick firing and drying systems are carried out both on gas and on solid fuel (coal, petroleum coke, wood waste) or fuel oil. We can manufacture spare parts for equipment in accordance with customer requirements