一、Core Business
Plastics injection moulds building
Pre & mass production of plastic parts
二、Project management system
A.Part Analysis, When we receive the 3D data, we will start the part analysis, show the gate position, parting line, potential concerns, etc. on the 3D drawing.
B.Mold Specification Sheet. After we receive the purchasing order, we will make the mold specifications as per your mold requirements, then send it to the client for confirmation. It is better if the customer can provide us with specifications and mold manufacturing standards.
C.Mold drawings. We will design the 2d drawing first when get the confirmation of the mold specifications, then the 3D mold drawing will be provided.
D.Tooling schedule. The tooling schedule will be provided after getting the confirmation for the steel cutting. This schedule will be updated on every Monday following, along with detailed noted projects of the process with photos.
E.First article inspection report. This will be provided after the mold trial, and also with the video and pictures showing the mold running status and samples status.
F.Before mold shipping. We will provide the checking list, which includes all the items which need to be confirmed before mold shipping, along with the pictures.