Mma Two-component High-light Pavement Marking Material (mma Cold Plastic)
- Location: China
- FOB Price: 3.032 ~ 3.906 / Kilogram ( Negotiable )
- Minimum Order Quantity: 1 Ton
- Supplying Ability: 500 Ton / Month
- Payment Type: Western Union, L/C, T/T
Product Description
- Other Names: MMA two component high light road marking paint
- MF: ---
- Main Raw Material: Acrylic
- Usage: Road Marking Paint, Building Coating
- Application Method: Spray/screed
- State: Liquid Coating
- Brand Name: JiuDa
- Advantage:
* Material from Evonik Industries;
* Excellent brightness and night visibility;
* Anti-crack & strong tenacity;
* Wear resistance is 2 times better than thermoplastic marking;
* Excellent aging resistance;
* Environment protection, 100% solid content and no volatile substances.
Construction mode includes spraying application and screed application and extruded application.
Consumption (Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )
Dosage table of curing agent (Used in B component)surface temperature 25℃ Spraying application
(0.5mm-0.7mm)Screeding application
(1.2mm-1.5mm)thickness 0.6mm 1.2mm paint 1kg/㎡ 3kg/㎡ Hardner 15g/㎡ 45g/㎡ primer 150g/㎡ Glass beads 0.5kg/㎡ 0.5kg/㎡ Paint Hardner Surface temperature(℃) Ratio of BPO Surface dry time (Min) Curing time (Min) B component White color
powder5 750g-800g 25 50 15 700g-750g 20 35 25 650g-700g 10 20 35 550g-600g 8 15
Technical Data:
·Retroreflective valve:≤350 mcd(white)
·Curing time:≤15minutes
·Density (g/cm³):2
·Abrasion resistance:≤35mg
Color:White/Yellow /Customize other colors
The matters needing to attention during the construction Dry & Clean & flat of road surface. Damaged road should be repaired before applying. Before applying, should add the hardner according to the ratio to the MMA two-component (Component B) pavement marking paint, then stir well. Avoid breathing vapors, eyes and skin should not touch the coating. During Construction, eating and drinking and smoking is prohibited.
Attention of construction
1. Clean and dry road surface.
2. Construction environment temperature is about 10℃ to 40℃,surface temperature generally
is above 5 ℃。
3. The curing time depends on the consumption of curing agent & the temperature of construction
environment, but has nothing to do with the thickness of the coating.
4. Strictly prohibited from direct sunlight during transport and storage, stored in ventilated
and shade and dry place, the storage temperature should be controlled in 0℃ to 40℃.
5. During screeding application, it is recommended that two scraper buckets be equipped for
continous replace.
Company Profile
- Shanxi Zhongtu TrafficTechnology Co., Ltd
- [ China ]
- This company is registered as a free member and is not verified or authenticated by Tradekey.com
-
ShanxiZhongtu Traffic Technology Co.,Ltd., one of the most famous road marking paint manufacturers in China, have 23years experience in Road Marking Paint. Our main business includes road marking paint, marking lines design and construction, and marking equipment development. There are six workshopslocated inChina so that we can provide fast service to our customers.
ShanxiZhongtu Traffic Tech...
Basic Information
- Company Products / Services: road marking paint, pavement marking paint, thermoplastic road marking paint, mma marking paint, two-component marking paint, marking paint, reflective road marking paint, colorful anti-skid road paint, anti-fouling road paint, rainy night road paint
- Year Established: 1996
- Number of Employees: 51-100
- Website: www.zhongtutrafficpaint.com