We proceed inspection system pertaining to production process with five stages as below:
>>Pre-Production Check (PPC): Risks are reduced by checking material components, accessories, prototype samples, etc., before mass production.
>> Initial Production Check (IPC): First finished products are checked against buyer's specification and prototype sample. Deviations are identified and brought out for correction.
>> During Production Inspections (DUPRO): Inspections during production are carried out to check and verify that the initial discrepancies have been rectified and to ensure the average quality standard of production runs.
>> Final Random Inspection (FRI): Final random inspection is carried out when the total consignment is packed and ready for shipment. FRI is performed according to the International Inspection Standards. The detailed physical inspection of the samples selected at random is based on specifications of Buyer and it cover the criteria such as design / style, accessories, appearance, markings, color, labeling, material, assortments, workmanship, measurements, packing etc.
>> Container Stuffing and Loading Supervision: An identification of the goods during the loading is made to ensure that only the inspected goods are being stuffed without getting mixed up with the un-inspected goods. Company will closely monitor the loading process, verify product quantity, and ensure proper handling of the cargo. Upon completion, the container(s) will be sealed.