Our company supply the tools and molds PVD/PACVD equipment.Include DLC coating equipment.
◇ Magnetic field size can be adjusted
◇ With high plasma density
◇ With high deposition efficiency
◇ Coating has a strong binding force
◇ Modular design, easy installation and disassembly
◇ With high target utilization rate and reduced cost
◇ Tailored and personalized solutions and equipment
◇ Coating TiN, TiCN, TiCrN, TiAlCrN, TiAlN, AlTiCN, CrN, ZrN, a-C: H: W / a-C: H
D100 Electromagnetic Arc Coating Equipment NH-ARC series |
|
NH-ARC850TES |
NH-ARC1000TES |
NH-ARC1100TES |
Vacuum-chamber dimensions |
D850X900 |
D1000X1100 |
D1100X1200 |
Even plated area |
D500XH500 |
D650XH650 |
D780XH780 |
Ultimate vacuum |
3.0*E-4Pa |
Pressure rise rate |
0.1Pa/hr |
Workpiece rotation frame |
Standard two sets of rotating system + trolley in the form of whole in and out |
Deposition device |
D100 permanent magnet + coil arcing |
Ion auxiliary device |
N-IGET arc-ion etching |
Vacuum testing |
Composite vacuum meter + thin-film vacuum gauge |
Heating system |
500℃, 3 roots thermocouples monitored |
Control system |
Touch manual automatic with automatic warm intelligent unattended shutdown linkage system |
cooling water circulation system |
With Japanese SMC water flow switch, intelligent control IPC + PLC automatic control |
Production operation cycle |
Coating (3um), 5-6 hours / furnace |
Coating (3um), 6-8 hours / furnace |
Coating (3um), 6-8 hours / furnace |
Ultimate load |
300KG |
500KG |
800KG |