Building Construction Elevator Guide Rail Attached Wall Rack

Shandong Boruida Machinery Technology Co., LTD

Product Description

  • The attached wall frame is a connecting part between the guide rail and the building to hold the lift guide rail and

    The overall structure is stable. Attached wall frame is installed along the guide rail height, generally according to 7.5m ~ 9m spacing to install a attached wall frame. Attach wall frame installation horizontal direction maximum inclination ±8°

Company Profile

  • Shandong Boruida Machinery Technology Co., LTD
  • [ China ]
  • This company is registered as a free member and is not verified or authenticated by Tradekey.com
  • Shandong Borida Machinery Technology Co., Ltd. is located in the beautiful zhangqiu district of Jinan city.  20 kilometers away from Jinan International airport, beautiful environment, transportation is very convenient.  Established in 2010, covers an area of 50 mu, building area of more than 10,000 square meters, with a total investment of 30 million yuan.Is a construction machinery manufactur...

Basic Information

  • Company Products / Services: construction elevator
  • Year Established: 2013
  • Number of Employees: 26-50
Contact Now