Our stockpile ın eastern Turkey currently sits at 30, 000 tonnes of zinc ore, and we are looking to make an initial shipment of 5, 000 tonnes as a means of making initial contact and establishing a relationship.
The overall stockpile grades at 27-33% Zn. We have an SGS report that was made at Mersin, Turkey on an earlier shipment from the same mine on 10 August 2008 that was sold. In line with our grade control projections, we would seek to offer a medium blend grading at about 28-30% Zn. The material is also rıch ın lead grading at 5-7% Pb.
The material can be delivered to the major local port in Mersin, Turkey within 10 days for shipment to China (Mersin has bulk and container facilities). We wish to do the sale FOB Mersin.