The installation was built in a modular principle that allows replacement of some components (such as frame, chamber and power supply). It helps to grow the crystals weighing 30, 60, 80 or 125 kg.
The installation is equiped with the modern DC power supply, manufactured in Europe. Power supply consists of separate blocks in paralell, which can be added depending on the required supply current. There is no electrodynamic vibration of the tungsten heater applying DC power supply. Efficiency of the power supply is 90%, capacity rate is over 0, 92, power consumption is uniform in all three-phase of the AC main. This reduces the necessary power of the worksgop substation at 25% and also reduces the electricity consumption at 15% during the process compared to the two-phase AC installations with thyristor control.